Employer’s Agent vs Clerk of Works vs QA manager: who does what?
The differences between an Employer’s Agent, a Clerk of Works and a QA manager on UK construction projects: who they work for, what they check and when you need each.
The differences between an Employer’s Agent, a Clerk of Works and a QA manager on UK construction projects: who they work for, what they check and when you need each.
A practical fire stopping inspection checklist for site teams: what to check at each penetration and joint, the records you need, and common defects that fail inspections.
How to set up a Field View project properly: current drawings split by area, construction details at the point of work, ITP-based forms with mandatory photos, registers, permissions and reports.
How M&E subcontractors can set up QA on mechanical and electrical packages: ITPs, penetration control, testing and commissioning records, and evidence that protects you in disputes and payment applications.
What a non-conformance report (NCR) is, when to raise one, what it must contain and how to close it out with evidence, with a fire stopping example.
What an O&M manual should contain, who provides each part, and how to build it during construction so handover, final payment and the golden thread are not delayed.
What an Inspection and Test Plan (ITP) is, what to include, how hold and witness points work, and a worked example for fire stopping.
A practical Gateway 3 checklist for higher-risk buildings: the QA records, inspections and golden thread information to collect during construction to avoid completion delays.
A Clerk of Works independently inspects workmanship and materials against drawings and specification. Here is what they do, what their reports contain and when to use one.
What the Building Safety Act means on site in 2026: higher-risk buildings, Gateways 2 and 3, the golden thread, dutyholders and the QA evidence contractors now need.