# Construction QA > Outsourced construction QA, Field View & Clerk of Works across the UK ## Posts - [Employer’s Agent vs Clerk of Works vs QA manager: who does what?](https://navajowhite-alpaca-759603.hostingersite.com/employers-agent-vs-clerk-of-works/): The differences between an Employer’s Agent, a Clerk of Works and a QA manager on UK construction projects: who they work for, what they check and when you need each. - [Fire stopping inspection checklist: what to check before it’s covered up](https://navajowhite-alpaca-759603.hostingersite.com/fire-stopping-inspection-checklist/): A practical fire stopping inspection checklist for site teams: what to check at each penetration and joint, the records you need, and common defects that fail inspections. - [How to set up Field View: drawings, details and forms that site teams actually use](https://navajowhite-alpaca-759603.hostingersite.com/field-view-setup-drawings-details-forms/): How to set up a Field View project properly: current drawings split by area, construction details at the point of work, ITP-based forms with mandatory photos, registers, permissions and reports. - [M&E package QA: how to set up records that comply and protect you](https://navajowhite-alpaca-759603.hostingersite.com/me-package-qa-compliance/): How M&E subcontractors can set up QA on mechanical and electrical packages: ITPs, penetration control, testing and commissioning records, and evidence that protects you in disputes and payment applications. - [How to write a non-conformance report (NCR) in construction](https://navajowhite-alpaca-759603.hostingersite.com/non-conformance-report-construction/): What a non-conformance report (NCR) is, when to raise one, what it must contain and how to close it out with evidence, with a fire stopping example. - [O&M manuals: what to include and how to stop them delaying handover](https://navajowhite-alpaca-759603.hostingersite.com/om-manuals-construction-handover/): What an O&M manual should contain, who provides each part, and how to build it during construction so handover, final payment and the golden thread are not delayed. - [Inspection and Test Plans (ITP) in construction: what to include, with an example](https://navajowhite-alpaca-759603.hostingersite.com/inspection-and-test-plan-itp-construction/): What an Inspection and Test Plan (ITP) is, what to include, how hold and witness points work, and a worked example for fire stopping. - [Gateway 3 checklist: the QA evidence you need for a completion certificate](https://navajowhite-alpaca-759603.hostingersite.com/gateway-3-checklist-qa-evidence/): A practical Gateway 3 checklist for higher-risk buildings: the QA records, inspections and golden thread information to collect during construction to avoid completion delays. - [What does a Clerk of Works do? Duties, reports and when to call one in](https://navajowhite-alpaca-759603.hostingersite.com/what-does-a-clerk-of-works-do/): A Clerk of Works independently inspects workmanship and materials against drawings and specification. Here is what they do, what their reports contain and when to use one. - [Building Safety Act 2026: a practical guide for contractors](https://navajowhite-alpaca-759603.hostingersite.com/building-safety-act-guide-for-contractors/): What the Building Safety Act means on site in 2026: higher-risk buildings, Gateways 2 and 3, the golden thread, dutyholders and the QA evidence contractors now need. ## Pages - [Join our team](https://navajowhite-alpaca-759603.hostingersite.com/join-our-team/): Join Construction QA: QA inspectors, Clerks of Works, Field View administrators and handover specialists across the UK. Apply online with your CV. - [Guides](https://navajowhite-alpaca-759603.hostingersite.com/guides/) - [Non-conformance report (NCR) (sample)](https://navajowhite-alpaca-759603.hostingersite.com/sample-reports/non-conformance-report-sample/): Two 110mm uPVC pipes and one cable tray pass through a 60-minute compartment wall with no fire stopping installed. Annular gap of 15–25mm around pipes. - [Gateway 3 QA evidence gap analysis (sample)](https://navajowhite-alpaca-759603.hostingersite.com/sample-reports/gateway-3-qa-evidence-gap-analysis/): Key finding: Evidence is strong for structure, sprinklers and smoke control. - [Monthly Field View QA report (sample)](https://navajowhite-alpaca-759603.hostingersite.com/sample-reports/monthly-field-view-qa-report/): Headline: Levels 1–3 drylining ITPs complete. First-time pass rate up from 78% in January. - [Clerk of Works call-out inspection (sample)](https://navajowhite-alpaca-759603.hostingersite.com/sample-reports/clerk-of-works-inspection-report/): Extension: blockwork to wall plate complete; steel beam installed over rear opening. Loft: dormer framing complete, floor joists 70% fixed. - [Sample reports](https://navajowhite-alpaca-759603.hostingersite.com/sample-reports/): Every visit and every package ends with clear, evidence-backed reporting. - [Home](https://navajowhite-alpaca-759603.hostingersite.com/): Field View inspections, ITPs, NCR tracking, Clerk of Works and construction reports. - [Privacy Policy](https://navajowhite-alpaca-759603.hostingersite.com/privacy-policy/): This website is run by Sapper Ltd, trading as Construction QA ("we", "us"). [comment]: # (Generated by Hostinger Tools Plugin)